Metering Forum

Notifications
Clear all

[Sticky] RDMW Validation Certificate - Module C – Existing meters for surface water extraction using a small concrete rectangular weir measurement structure

Irrigation Australia
(@irrigation-australia)
Member Admin

This form is to be completed by an Authorised Meter Validator1 for the validation of water metering installations using a small
concrete rectangular weir measurement structure forming part of surface water works extracting water under the authority of the
Water Act 2000.
Where a water meter meets the requirements of Module C of the Queensland interim water meter standard for non-urban
metering (interim standard), the authorised meter validator must give the relevant person2 a copy of this form as a validation
certificate, within 20 business days of an inspection of the water meter. The relevant person must give a copy of the validation
certificate to the Department of Regional Development, Manufacturing and Water within 20 business days of receipt of the
validation certificate.

Where a water meter does not meet the requirements of Module C of the interim standard, the authorised meter validator must
provide the relevant person with a copy of this form as a validation notice explaining why, and any potential modifications that
could allow the meter to become compliant. The relevant person or the authorised meter validator may provide a copy of this
notice to the department.

Download Validation Certificate Module C

 
This topic was modified 11 months ago by Irrigation Australia
This topic was modified 3 months ago 3 times by Irrigation Australia
Quote
Topic starter Posted : 06/09/2021 8:15 pm
Share: