Metering Forum

Notifications
Clear all

How can I ensure that the installation of a secondary telemetry unit won’t compromise my meter and LID?

Irrigation Australia
(@irrigation-australia)
Member Admin

How can I ensure that the installation of a secondary telemetry unit won’t compromise my meter and LID?

 

Provided ports are electrically isolated, any short circuit in the port should not affect the operation of the meter itself or the second port. *It is the duly qualified person’s responsibility to ensure that communication ports are adequately protected and isolated as per the relevant Australian Standard and all the terminals will be labelled with safety message as per the voltage levels to guide users accessing the installation.

Quote
Topic starter Posted : 28/10/2021 10:35 am
Share: